Location: 1941 Stryker Way, Portage, MI 49002
Owner: Stryker Instruments
Project Size: 485,000 sq. ft. research and development facility on an 80-acre site
Awards:
• APWA SW MI Branch Public Works Project of the Year – Transportation Greater than $5M
Project Summary: Hurley & Stewart completed the design of this complex road system complete with a double roundabout, 4-phase traffic signal, off-road pedestrian path, and storm water treatment and disposal system in a development partnership with the WMU Foundation, City of Kalamazoo, and Kalamazoo Public Schools. Significant features of this project included:
• Project Cost: $150 M
• Developed extensive grading plans, 280,000 cyds. of earth moved
• 1,515 space employee parking lots and internal circulation routing for employees and deliveries.
• Developed elaborate storm water management system to convey, treat, and infiltrate 650,000 cft of storm water.
• Designed water feature for roof stormwater management and aesthetically pleasing site feature. Incorporated make-up well in design to maintain water level.
• Collaborated with landscape designers to create natural berming and outdoor uses including on site paths and patio areas.
• Coordinated with adjacent public roadway project including traffic study, public utility extensions, storm water management, shared use pathways, roundabout, and traffic signal.