Project Summary:
Hurley & Stewart completed the civil engineering and site design of this exciting brewing and hospitality destination helping to revitalize a long-vacant heavy industrial property in downtown Kalamazoo. The site design focused on maximizing views and access to the adjacent Kalamazoo River while managing floodplain, storm water disposal, and environmental contamination issues. Significant features of the project were:
• Project cost: $4.2 M
• Floodplain and floodway encroachment permit obtained from the MDEQ
• Mitigated environmental impacts from former power plant facility
• Complex storm water collection, treatment and infiltration design
• Designed an outdoor seating and beer garden area adjacent to the Kalamazoo River for patron enjoyment