Location: Trail end points: Kal-Haven Trail; E. D Ave. just east of the Kalamazoo River (Kalamazoo) and Galesburg-Augusta Primary School at S. 35th St. and W. Battle Creek St. (Galesburg)

Length: 24 miles

Project Summary:

•Designed and constructed 15 +/- miles of ADA and AASHTO compliant non-motorized trail system.

•Trails connect the City center to various City and County Parks and the Kalamazoo Nature Center.

•Designed intersection, railroad, and mid-block pedestrian crossings to ADA standards.

•Designed and inspected five pedestrian bridge structures over rivers and creeks and multiple boardwalk sections across wetlands.

•Prepared cost estimates and coordinated all work with MDOT

•Prepared ROW acquisition documents and worked with property owners for all segments