Location: 500 Trade Centre Way, Portage, MI 49002 

Owner: TMI Hospitality

Size: 86,083 sf. Four-story hotel on 2.44-acre site

Project Summary: Hurley & Stewart performed the conceptual and final civil engineering, utility, and grading design of this four-story hotel development with frontage along I-94 in Kalamazoo County. H&S also managed the site plan approval process through the City and obtained required permits from the MDEQ. Significant features of this commercial development were:

•  Project cost: $15 M

•  Over 9,500 CY of earth moved to balance and grade the site

•  Designed sheet piling wall and grading to avoid impact on adjacent floodplain and wetland areas

•  Completed Floodplain Elevation Certificate for the owner

•  Extended public water main to accommodate project

•  Designed underground storm water storage system with sophisticated treatment/transfer structure outlet to wetland