Municipal

Portfolio
  • NE Transmission Main
    NE Transmission Main
    Municipal
  • Portage Road Trailway
    Portage Road Trailway
    Municipal
  • Blue Star Trail – Allegan County
    Blue Star Trail – Allegan County
    Municipal
  • Stryker Way
    Stryker Way
    Municipal
  • Arboretum Parkway Roundabouts and Boulevard
    Arboretum Parkway Roundabouts and Boulevard
    Municipal
  • Kalamazoo River Valley Trail
    Kalamazoo River Valley Trail
    Municipal
  • Harrison Road
    Harrison Road
    Municipal
excavation w plane
excavation w plane
Pipe to pull
Pipe to pull
boring
boring
bore pipes delivered
bore pipes delivered
new water line
new water line
NE Transmission Main

Location: Kalamazoo / Battle Creek International Airport 5235 Portage Rd, Portage, MI 49002

Owner: City of Portage

Project Summary:

  • Extended a 20-inch watermain from the east side of the Kalamazoo / Battle Creek International airport to the west side of the airport.
  • Hurley & Stewart designed the extension and oversaw the construction.
  • Without shutting down the taxi ways and runways, the contractors jack and bored 42” casing 543’ and then met up in the other direction with a 30” casing the final 224’.
  • Pulled 800 feet of watermain though pipes.
Categories :
Municipal
Trail 1
Trail 1
Trail 2
Trail 2
Trail 3
Trail 3
portage road trail resize
portage road trail resize
portage trail resize
portage trail resize
Portage Road Trailway

Location:  Portage, MI Location

 

Owner:   City of Portage

 

Length: 1.21-mile extension

 

Project Summary:

Construction on the Portage Road Trail project began in late 2019 and was completed in 2020. The project consists of a 1.21-mile trailway extension from the existing trail at Portage/Ramona Roads, heading south along the west side of Portage Road. This segment of trail ends approximately a quarter mile north of Centre Avenue. The City of Portage plans to continue the trail in the future to join the City’s network of trails. H&S provided design and construction inspection services for the City of Portage. Part of H&S’s job on this project was to coordinate design and construction with the properties along the trail.

Portage Parks and Recreation hope that this stretch of trail will be a part of the next Borgess marathon route.

 

Categories :
Municipal
BST fall sign 1
BST fall sign 1
BST fall fire dept
BST fall fire dept
BST fall 16
BST fall 16
BST fall 13
BST fall 13
BST fall 12
BST fall 12
BST fall 9
BST fall 9
BST fall 8
BST fall 8
BST fall 6
BST fall 6
BST fall 3
BST fall 3
BST fall 2
BST fall 2
BST fall 1
BST fall 1
Blue Star Trail – Allegan County

Location: Along Blue Star Highway, Allegan County, Michigan ; Location

 

Categories :
Municipal
Stryker Way GE
Stryker Way GE
Stryker-Way-3
Stryker-Way-3
Stryker-Way-4
Stryker-Way-4
Stryker-Way-5
Stryker-Way-5
Stryker-Way-6
Stryker-Way-6
Stryker-Way-7
Stryker-Way-7
Stryker-Way-8
Stryker-Way-8
Stryker-Way-9
Stryker-Way-9
Stryker-Way-10
Stryker-Way-10
Stryker-Way-11
Stryker-Way-11
Stryker-Way-12
Stryker-Way-12
Stryker-Way-13
Stryker-Way-13
Stryker-Way-14
Stryker-Way-14
Stryker-Way-15
Stryker-Way-15
Stryker-Way-16
Stryker-Way-16
Stryker-Way-17
Stryker-Way-17
Stryker-Way-18
Stryker-Way-18
Stryker-Way-19
Stryker-Way-19
Stryker-Way-20
Stryker-Way-20
Stryker-Way-21
Stryker-Way-21
Stryker-Way-22
Stryker-Way-22
Stryker-Way-23
Stryker-Way-23
Stryker-Way-24
Stryker-Way-24
Stryker-Way-25
Stryker-Way-25
Stryker-Way-26
Stryker-Way-26
Stryker-Way-27
Stryker-Way-27
Stryker-Way-28
Stryker-Way-28
Stryker-Way-29
Stryker-Way-29
Stryker-Way-30
Stryker-Way-30
Stryker Way

Location: Roadway between Lovers Ln. and Portage Rd, Portage, MI; Location

Development Size: 0.9-mile roadway to serve approximately 290-acre industrial zoned property

Owner: Stryker Instruments, City of Portage

Project Summary:

  • Project Cost: $6 M
  • Coordinated public and private partnership with Stryker and City of Portage.
  • Designed roadway with two-lane and boulevard sections to maximize land use potential.
  • Developed roundabout to connect roadways and driveways near the center of the project.
  • Performed traffic study and designed intersection improvements at connections to existing public roadways.
  • Engineered public water and sanitary sewer extensions. Obtained required permits from MDEQ.
  • Coordinated with adjacent industrial development for shared storm water management system.
  • Designed 1.5 mile shared use pathway to connect to existing City recreation system.
  • Developed traffic signal plans for Portage Rd. intersection. Constructed with MDOT grant
  • Performed on-site inspection services to conform with City of Portage documentation requirements.
Categories :
Municipal
arboretum1
arboretum1
arboretum2
arboretum2
arboretum3
arboretum3
arboretum4
arboretum4
arboretum5
arboretum5
arboretum6
arboretum6
arboretum7
arboretum7
arboretum8
arboretum8
arboretum9
arboretum9
arboretum10
arboretum10
arboretum11
arboretum11
arboretum12
arboretum12
Arboretum Parkway Roundabouts and Boulevard

Location: Roadway between S. Drake Rd. and Howard St, Kalamazoo, MI; Location

Development Size: 1.2-mile roadway, approximately 140-acre development area

Owner: WMU Foundation, City of Kalamazoo

Project Summary: Hurley & Stewart completed the design of this complex road system complete with a double roundabout, 4-phase traffic signal, off-road pedestrian path, and storm water treatment and disposal system in a development partnership with the WMU Foundation, City of Kalamazoo, and Kalamazoo Public Schools. Significant features of this project included:

  • Project Cost: $3.6 Million
  • Public road project with regional storm water management, public water extension, and public sewer extension
  • Developed multiple concepts to create connection from Drake Rd. to north side of Western Michigan University’s campus.
  • Investigated ways to utilize property for future development opportunities including Walden Woods Condominiums (currently under development), Parkway Flats Apartments (currently under development), Gilden Woods Daycare, and other commercial sites.
  • Designed site to have access to public utilities.
Categories :
Municipal
2010-11-10_10-52-35_693
2010-11-10_10-52-35_693
2012-09-06_15-50-27_857
2012-09-06_15-50-27_857
2012-11-16_12-54-04_587
2012-11-16_12-54-04_587
Trail bridge
Trail bridge
20150622_104633 resize
20150622_104633 resize
2012-11-16_12-59-47_305 resize
2012-11-16_12-59-47_305 resize
Kalamazoo River Valley Trail

Location: Trail end points: Kal-Haven Trail; E. D Ave. just east of the Kalamazoo River (Kalamazoo) and Galesburg-Augusta Primary School at S. 35th St. and W. Battle Creek St. (Galesburg)

Length: 24 miles

Project Summary:

  • The Kalamazoo River Valley Trail will eventually encompass 35 miles of trails throughout the county and currently contains 24 miles of trails.
  • Hurley & Stewart has been involved in Master Planning, Designing, Engineering and Construction, managing miles of the trail in the last 10 years.
Categories :
Municipal
Harrison-Road-1
Harrison-Road-1
Harrison-Road-2
Harrison-Road-2
Harrison-Road-3
Harrison-Road-3
Harrison-Road-intersection
Harrison-Road-intersection
harrison road 1
harrison road 1
harrison road 3
harrison road 3
harrison road 5
harrison road 5
harrison road foundry
harrison road foundry
Harrison Road

Location: 600 E Michigan Ave., Kalamazoo, Michigan ; Location

Categories :
Municipal